Construction
Staking
Meyer Land Surveying provides daily construction staking services for some of the most demanding projects in Southern California. From a $250 million stadium to a 2.5-mile National Park boardwalk, our field crews translate design plans into precise ground control — ensuring every structure, utility, road, and improvement is built exactly where it belongs.
What is Construction Staking?
Meyer Land Surveying provides daily construction staking services for some of the most demanding projects in Southern California. From a $250 million stadium to a 2.5-mile National Park boardwalk, our field crews translate design plans into precise ground control — ensuring every structure, utility, road, and improvement is built exactly where it belongs.
Meyer Land Surveying has delivered construction staking services across Southern California since 2015, combining licensed expertise with state-of-the-art technology to produce precise, compliant, and timely results for every client.
How We Deliver Construction Staking
Plan Review
Our office staff reviews construction documents, resolves design conflicts, and prepares staking calculations before crews arrive on site.
Control Establishment
Horizontal and vertical control is established from the project's survey control network, verified against the design datum.
Layout Staking
Field crews stake all required elements — building grids, utilities, roads, curbs, grades, walls, and improvements.
As-Built Verification
As construction progresses, we perform as-built checks and certifications to confirm work is within tolerance.
Documentation
Daily field forms, RFI monitoring, and change-order tracking are maintained throughout the project.
Representative Projects
Ontario Ballpark — $250M Stadium
Daily construction staking for the stadium structure, on- and off-site utilities, street improvements, parking lots, and landscape improvements.
Boardwalk Over Salt Creek — Death Valley NPS
Construction staking for a 2.5-mile elevated boardwalk and roadway improvements in Death Valley National Park.
SR-91 Design-Build Freeway
Managed survey operations for 5 field crews covering hundreds of thousands of feet of curb, roadway, drainage systems, walls, and 30+ bridge structures.
Standard Deliverables
Request a Quote for Construction Staking
Tell us about your project and we will respond within one business day with a detailed proposal tailored to your site and scope.
